1. Excavation of the former training pitch and establish new formation levels;
2. Installation of new drainage system and storm water discharge connection;
3. Installation of a complete new Rainbird automatic irrigation system by local specialist In-Aqua;
4. Complete new pitch profile construction comprising of a gravel raft, blinding layer and sand lower rootzone layer;
5. Amelioration of high quality peat from Germany into the rootzone layer;
6. Soil retaining structure and perimeter drainage channel installation;
7. Installation of SPS HYBRIGRASS hybrid turf system.